Developers

Water Main Installation Specifications  
Water line specifications and material requirements for design and installation of water distribution system.

Application for Special Connection - Fire Sprinkler Service
Annual fee charged according to size of  tap made for the fire sprinkler system.

Portable Fire Hydrant Meter Service Form
Application for temporary water via fire hydrant meter. Form must be completed and returned with $50.00 service fee to Eastside Utility District office.

Contractor-Subcontractor Agreement Form

Agreement for Proposed Development

Backflow Assembly Test Report

Request for Fire Flow Test - The fee for a fire flow test is $300.00. Contact Richard Reading at 423-490-9522.